HomeDefensePentagon has suspended delivery of new engines for F-35 fighter-bombers

Pentagon has suspended delivery of new engines for F-35 fighter-bombers

-

The mishap that occurred on December 15, 2022, with an F-35B fighter bomber in its STOVL (short take-off and vertical landing) configuration during a test flight in Fort Worth, Texas, while the aircraft was still under the responsibility of its manufacturer, Lockheed-Martin, led to several different outcomes.

As a result, and pending the findings of the investigation, which appears to be moving towards a failure of a tube used to send high-pressure fuel to the F-135 engine, the Pentagon has decided to restrict flights for a number of planes. This decision was made in light of the fact that the investigation is moving towards the failure of the tube. As a result of this, a portion of the Israeli Air Force’s fleet of F-35 “Adir” aircraft, which are descended from the “original” version [F-35A, editor’s note] of the Lockheed-Martin aircraft, has been rendered inoperable.

In addition, acceptance flights for newly delivered aircraft have been halted until the inquiry is being conducted, which will have the practical impact of delaying deliveries for the last two weeks of December. This indicates that Lockheed-Martin was unsuccessful in accomplishing its goals for the year 2022 since only 141 of the 148 F-35 aircraft contractually slated for delivery were delivered.

The delivery of brand-new F-135 engines, which were previously provided by Pratt & Whitney, has been temporarily halted as a further consequence. On December 27, a decision was made about this matter.

According to an explanation provided by the Department of Defense, The F-35 Joint Program Office and Pratt & Whitney have agreed to delay scheduled deliveries and acceptance of the F-135 engines until further information regarding the investigation [of the crash of the December 15, editor’s note] are known, and that flight safety can be ensured.

The United States Air Force worried there might be a scarcity of F-135 jet engines in the year 2028 due to longer repair durations, some of which were caused by undisclosed faults in engine blade coatings.  According to what was revealed, even though these cracks “do not pose a threat to the safety of flight,” they “do shorten the useful life of an engine.”

Since then, there has been no change in this circumstance. In a study that was issued in July 2022 by the Government Accountability Office (GAO), it was said that an increasing number of F-35 jets could not fly due to a lack of engines in good condition to perform.  And to sound the alarm that the price of engine maintenance may skyrocket by 2028, rising from 315 million to one billion dollars.

Anyway, at the end of December, the Pentagon and Lockheed-Martin came to an agreement that was worth 30 billion dollars and related to the production and delivery of 398 F-35s divided into three batches [numbers 15, 16, and 17], the last of which included the planes that Belgium, Finland, and Poland ordered. This deal was finalised at the end of December 2022.

Frontier India News Network
Frontier India News Networkhttps://frontierindia.com/briefs
Frontier India News Network is the in-house news collection and distribution agency.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

More wheels, more power: GDELS rolls out innovative 10×10 Piranha HMC

The Swiss company General Dynamics European Land Systems - MOWAG (GDELS-MOWAG, the Swiss branch of the General Dynamics corporation) has unveiled a new variant...

Russia Doubles Combat Power of Deadly Shahed-136 Drones Targeting Ukraine

The combat capabilities of Russia's Shahed-136 strike drones, which are used to target Ukraine, have been upgraded, according to recent claims that have appeared....

Airbus’s Schöllhorn Challenges Scholz’s Stance on Taurus Missiles Deployment

Olaf Scholz was wrong when he publicly stated that the servicing, including the targeting of Taurus missiles, requires the personal presence of German military...

President to Sign Bill Expanding US Spying Powers, Warrant Requirement Rejected

According to a statement from Jake Sullivan, the national security advisor to the American President, the U.S. Senate has supported a bill to reform...

Upgrade for UK Military: H145s Take Over From Pumas in Cyprus and Brunei

The United Kingdom Ministry of Defence has ordered an additional six Airbus H145 helicopters as part of its ongoing initiative to modernize its rotary...