Russia’s SJ-100 Takes a New Turn as Irkutsk Begins Aircraft Painting Expansion

Irkutsk Aviation Plant is expanding its aircraft finishing capabilities as the SJ-100 prototype arrives for a new UAC corporate paint scheme using Russian-made coatings. The development marks another step towards bringing aircraft painting and final completion operations in-house, supporting Russia's wider MC-21 production ambitions.

Must Read

Frontier India News Network
Frontier India News Networkhttps://frontierindia.com/
Frontier India News Network is the in-house news collection and distribution agency.

The Irkutsk Aviation Plant (IAZ), a branch of Yakovlev within the United Aircraft Corporation (UAC), is currently improving its aircraft finishing capabilities. An experimental SJ-100 has been delivered to the facility for a new exterior paint scheme. The aircraft, assigned the factory number 97001, arrived in Irkutsk on November 24 after a nonstop flight of over five hours from Zhukovsky, near Moscow. It will receive the UAC corporate livery using domestically manufactured paint and coating materials supplied by Russian Paints (Russkiye Kraski).

Arrival of SJ-100 97001 for Painting

The aircraft arrived at the plant following a nonstop flight from Zhukovsky to Irkutsk that lasted over five hours.

The project is significant because it will extend the plant’s painting experience from older regional aircraft to a modern passenger jet. UAC has verified that the SJ-100 will be the first aircraft in this family to undergo painting in Irkutsk.

The use of Russian-made coating materials is also an important element of the exercise. The project will offer the chance to incorporate domestic products into the exterior of a contemporary commercial aircraft within the production infrastructure of one of Russia’s primary aircraft manufacturing facilities.

From An-24 and An-26 to the SJ-100

IAZ began developing its civil aircraft painting capability in 2026. The first aircraft used to establish the process was an An-24 operated by IrAero, which received a renewed exterior finish in early September. The plant subsequently completed similar work on an An-26, registration RA-26051, with the second aircraft’s repainting reported on November 17.

The work is being performed by the final painting section of Workshop 208. The procedure includes more than simply applying a new exterior color scheme. Before applying a specialized paint-removal solution to aircraft undergoing repainting, technicians first safeguard windows, structural joints, and other sensitive areas. The aircraft surface is examined and presented to the customer after the old coating has been removed. The preparation is followed by primer application, two layers of the main paint, and the application of aircraft markings.

The experience gained from the An-24 and An-26 projects has allowed the plant’s specialists to refine the sequence of operations and improve working efficiency. The aircraft were also useful in evaluating the quality of the final coating and pinpointing areas where the process could be improved.

The SJ-100 represents a further step in this development. In contrast to the turboprop aircraft of the past, it is a contemporary regional jet that offers the plant experience that is suitable to the finishing requirements of modern commercial aircraft.

Moving Aircraft Painting from Ulyanovsk to Irkutsk

The expansion of painting capabilities is connected to a wider change in the production arrangements for the MC-21 and SJ-100 programs. Spektr-Avia was previously responsible for the exterior painting of Russian civil aircraft at its facility in Ulyanovsk. In the previous arrangement, aircraft manufactured in Irkutsk were required to be transported to another region for painting before returning to resume later production or delivery-related operations.

UAC is currently planning to relocate a portion of this project to Irkutsk. The objective of the decision is to minimize the logistical requirements associated with transporting completed aircraft between manufacturing and finishing facilities. It also allows the manufacturer to bring more of the final production process under the control of the aircraft assembly plant.

Andrey Soynov, the General Director of the Irkutsk Aviation Plant, informed in an interview published on October 1 that the facility was improving its painting capabilities by undertaking experimental work on IrAero aircraft. He also confirmed an agreement to paint an experimental import-substituted Superjet and stated that an MC-21, factory number 73054, was scheduled for painting in November using Russian coatings. That aircraft was then carrying the livery of Rossiya Airlines.

The subsequent arrival of SJ-100 97001 on November 24 confirms the next stage of the program.

Part of a Wider MC-21 Production Integration Program

Aircraft painting is a component of a more comprehensive strategy to increase the final production operations at Irkutsk. The facility is also in the process of installing passenger cabin interiors and onboard domestic systems on MC-21 aircraft that are in serial production. The objective is for these activities to be integrated into the manufacturing workflow, rather than being managed in separate locations.

According to Soynov, the plant expects to begin regular painting of serial MC-21 aircraft from the beginning of 2027. It is also intended that the installation of passenger interiors become a consistent production activity in 2027. The goal is to increase the number of aircraft produced at Irkutsk and facilitate their direct delivery to clients from the manufacturing facility.

This approach should simplify the movement of aircraft through the final stages of production. It also reduces the need to coordinate separate finishing operations with external contractors. The availability of painting and cabin installation at the assembly site may become more critical to maintain the intended manufacturing flow as MC-21 production increases.

The development does not mean that all painting work previously assigned to Spektr-Avia will immediately move to Irkutsk. The available announcements describe a transfer of part of the work and the gradual establishment of the plant’s own capabilities.

In conclusion,

The arrival of SJ-100 97001 marks an important step in the Irkutsk Aviation Plant’s expansion into complete aircraft finishing. The facility is currently using Russian-made coatings to apply its developing expertise to a modern passenger aircraft, following the repainting of the An-24 and An-26. In the long term, the goal is to incorporate aircraft painting, cabin installation, and final preparation into the production of the MC-21 at Irkutsk. The target for regular serial aircraft painting is 2027.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Latest

More Articles Like This